LowVoltra Get started

From floor plan to punch list, in five steps

Here's exactly how a low-voltage job moves through LowVoltra - the same flow your team will use on day one.

Step 1

Upload the floor plan you already have

Drag in an image or a PDF of the building. LowVoltra converts PDF sheets into crisp, zoomable plans and lets you set the real-world scale so every measurement is honest.

Step 2

Drop devices right where they'll be installed

Place cameras, speakers, displays, access points, network drops, and fire devices on the plan - or pull from your company's fixtures library with pricing already attached. Each device carries its own label, properties, and notes for the crew.

Step 3

Route cable through real hallways - automatically

Every device gets routed back to your MDF/IDF closet along walkable paths, not straight lines through walls, so your wire counts hold up on install day.

Step 4

Get a priced bill of materials instantly

Cable footage, devices, connectors, network drop materials, and port allocations roll up into a quote-ready BOM the moment your layout changes - download it as a priced CSV, or export the plan itself as a high-resolution image.

Step 5

Hand it to the field crew

Installers open the same plan on a phone or tablet on site, see every device location, check devices off as they're installed, and leave field notes right on the plan - no markups, no phone tag.

Want to try it on one of your own plans?

Start a free trial - no credit card - or reach out and we'll walk your team through it.

Start a free trial · Contact us